- A. Configure the logging synchronous global configuration command.
- B. Configure the logging synchronous command under the vty.
- C. Increase the number of lines on the screen using the terminal length command.
- D. Configure the logging delimiter feature.
- E. Press the TAB key to reprint the command in a new line.
The post A network administrator is implementing a routing configuration change and enables routing debugs to track routing behavior during the change. The logging output on the terminal is interrupting the command typing process.<br> Which two actions can the network administrator take to minimize the possibility of typing commands incorrectly? (Choose two.) appeared first on Majanto.