- A. @@ -20191007T1200 +88,90 @@
- B. @@ -88,10 +88,6 @@
- C. @@ -90,88 +20191008T1349 @@
- D. @@ -20191007T1200 +20191008T1349 @@
The post Which line is an example of the start of a chunk from a unified diff? appeared first on Majanto.
The post Which line is an example of the start of a chunk from a unified diff? appeared first on Majanto.